FPSO modification steelwork

Steelwork for FPSO modifications: pipe support frames, hull interface steelwork, access platforms and drawings for class submission.

What we need from you
  • The scope of the modification and the equipment or pipe data
  • Laser scan data or drawings of the area
  • Any design by others that the steelwork must follow
  • Class and operator requirements
What you get
  • Calculations
  • A 3D model
  • Fabrication-ready drawings, including drawings for class submission
  • Bills of materials
Fixed feequoted for a defined scope before work starts
2 to 4 weekstypical, from receiving the data
One working dayfor a reply to your enquiry
Jobs of this kind

Ask for a fixed-fee quote

Send what you have. We reply within one working day, and there is no charge for a quote.

Scope a package