FPSO modification steelwork
Steelwork for FPSO modifications: pipe support frames, hull interface steelwork, access platforms and drawings for class submission.
What we need from you
- The scope of the modification and the equipment or pipe data
- Laser scan data or drawings of the area
- Any design by others that the steelwork must follow
- Class and operator requirements
What you get
- Calculations
- A 3D model
- Fabrication-ready drawings, including drawings for class submission
- Bills of materials
Fixed feequoted for a defined scope before work starts
2 to 4 weekstypical, from receiving the data
One working dayfor a reply to your enquiry
Jobs of this kind
Ask for a fixed-fee quote
Send what you have. We reply within one working day, and there is no charge for a quote.