Pipe supports and hull connectors for new overboard lines on an FPSO

ServiceFPSO modification steelwork
AssetFPSO
RegionGulf of Guinea
Year2026
2026 ยท GULF OF GUINEA
From our own model. New steel in orange.
Problem

New overboard seawater and produced-water lines on an FPSO offshore West Africa needed supporting across the deck and connecting to the hull.

What we did

Designed the deck pipe support frames: bolted goalposts with hold-down and guide details. Modelled the hull connectors and produced their fabrication drawings to the third party's connection design.

What went out

Fabrication drawings and 3D models of the deck supports and the hull connectors, bills of materials, and replies to technical queries. The hull connector drawings were prepared for class submission.

Our part

Deck supports: design, drawings and engineering check. Hull connectors: modelling and fabrication drawings only. The hull connection design and its engineering check were by others.

A job like this one?

Send what you have. We reply within one working day and quote a fixed fee before any work starts.

Scope a package