Replacement microwave dish supports
ServiceNew support structures on existing decks
AssetFixed gas platform
RegionSouthern North Sea
Year2026
From our own model. New steel in orange.
Problem
The support for a microwave dish on a gas platform had corroded through.
What came in
Laser scan data, the dish operator's pointing criterion and the wind loading.
What we did
Concept calculations to the pointing criterion and a 100-year wind, then a through-bolted arm, pole and brace detailed from the scan data.
What went out
A concept calculation package, seven fabrication drawings and a 3D model, with site checks of the existing deck member called for before installation.
Codes
EN 1993-1-1, BS EN 1090-2.
Our part
Design, calculations, drawings and engineering check.
More new support structures on existing decks
A job like this one?
Send what you have. We reply within one working day and quote a fixed fee before any work starts.