All-bolted replacement of a corroded pipe support

ServiceCorroded steelwork repair
AssetFixed gas platform
RegionSouthern North Sea
Year2026
2026 ยท SOUTHERN NORTH SEA
From our own model. New steel in orange.
Problem

A pipe support on a gas platform had corroded, and welding and grinding were not permitted.

What came in

Laser scan data.

What we did

The new clamps sit on clean parent steel below the corroded pads. The span beams are supplied long, then trimmed and drilled on site using the splice plates as templates.

What went out

Concept option figures, a 3D model and an eight-sheet fabrication drawing package, with written answers to the client's questions.

Our part

Design, drawings and engineering check.

A job like this one?

Send what you have. We reply within one working day and quote a fixed fee before any work starts.

Scope a package